1

Site Preparation

Clear and grade the subgrade to the design elevation. Ensure uniform compaction and correct moisture content.

2

Geocell Panel Expansion

Expand the geocell panel accordion-style. Anchor the leading edge with anchors or stakes at specified intervals.

3

Cell Anchoring

Insert anchors through pre-punched slots into the subgrade. Typical spacing is 1–2 m depending on slope angle.

4

Cell Infill

Fill cells with approved fill material (soil, aggregate, or concrete). Compact to specified density.

5

Final Inspection

Verify cell alignment, infill levels, and anchorage. Check for any surface irregularities before handover.