Installation Process
1
Site Preparation
Clear and grade the subgrade to the design elevation. Ensure uniform compaction and correct moisture content.
2
Geocell Panel Expansion
Expand the geocell panel accordion-style. Anchor the leading edge with anchors or stakes at specified intervals.
3
Cell Anchoring
Insert anchors through pre-punched slots into the subgrade. Typical spacing is 1–2 m depending on slope angle.
4
Cell Infill
Fill cells with approved fill material (soil, aggregate, or concrete). Compact to specified density.
5
Final Inspection
Verify cell alignment, infill levels, and anchorage. Check for any surface irregularities before handover.